Project Description
The Riyadh Metro is a rapid transit system under construction in the city of Riyadh, the capital of Saudi Arabia. It will consist of six metro lines spanning a total length of 176 kilometers, with 85 stations. The project will cost $22.5 billion to build. It is scheduled for a light opening in 2019, and the full network is expected to be operational in 2021.
Line 4 (Yellow Line) joins King Khalid International Airport KKIA to the King Abdullah Financial District, all above ground. The length of the line is around 29 km and it features 8 stations
The Two (2) King Khalid International Airport Elevated Stations 4G2 and 4G3 will serve passengers arriving at and departing from King Khalid International Airport and will connect Terminals 1, 2,3 & 4.
Provided Services
Scope of Work
IBECE was involved in the design and development the external façade typologies of the Two (2) Elevated Airport Stations 4G2 and 4G3 with the related Skywalk Bridges including the following: